Floating cranes and derrick barges Fixed platforms Jack-up rigs Semi-submersible drilling rigs Submersible rigs Non-specialized projects

Business location


TOPSIDE OF DRILLING PLATFORM FOR THE CHAIVO FIELD IN THE SAKHALIN SHLF

PURPOSE: 2-rig drilling of a cluster of up to forty eight 5000-m wells; simultaneous drilling and operation of well cluster; operation of wells in the area of the Sakhalin Eastern Shelf.


MAIN PARTICULARS

Weight and dimensions in assembly:

  • length x width x height (incl. rig), m 117.0 x 88.0 x 72.8
  • light weight, t 16600